Search plants, projects, owners, and states
300 MW BESS planned in Kings, NY
300 MW
Nameplate Capacity
2
Generators
units
Batteries
Technology
Planned: —
Planned Operation
Coordinates
40.7065, -73.9702
County
Kings, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | NYC Energy LLC | NYC ENERGY | — |
| Owner(s) | NYC Energy LLC | SEF Industries | — |
| Status | Planned | — | — |
The NISA Electric Generation Project, located in Kings County, New York, is a 300 MW battery energy storage system. It is owned by SEF Industries and operated by NYC Energy LLC. The plant utilizes batteries as its primary fuel source (MWH) and consists of two generators.
The NISA Electric Generation Project operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. It is ranked as the largest of 6 battery storage facilities in New York State and 144th out of 514 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $408.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
NYPA_KENT_____GT
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone J
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about NISA Electric Generation ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo