Search plants, projects, owners, and states
3 MW Solar operating in Lewis and Clark, MT
3 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2017
Operating Since
Coordinates
46.6963, -112.0658
County
Lewis and Clark, MT
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Adapture Renewables, Inc. | Adapture Renewables, Inc. | — |
| Owner(s) | Adapture Renewables, Inc. | — | — |
| Status | Operating | operating | — |
Green Meadow Solar, LLC is a 3 MW solar photovoltaic power plant located in Lewis and Clark County, Montana. The plant began operating in 2017 and has one generator. Adapture Renewables, Inc. is the plant's operator. Green Meadow Solar ranks sixth in size among Montana's nine solar plants, and 3,898th nationally out of 7,108 solar plants.
The plant utilizes single-axis tracking to maximize solar energy capture. In its most recent year of operation, Green Meadow Solar generated 5,451 MWh of electricity, achieving a capacity factor of 20.7%. The plant is located within the NorthWestern Energy (NWMT) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
NorthWestern Energy (NWMT) (NWMT)
Grid Voltage
12.4 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
110 MWh
Latest Month
5.5K MWh
Annual Generation
20.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2017
$2,707/kW
Est. Construction Cost
Total estimated cost: $8.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Green Meadow Solar, LLCForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo