100 MW Natural Gas operating in Victoria, TX
100 MW
Nameplate Capacity
2
Generators
units
Natural Gas Fired Combustion Turbine
Technology
2020
Operating Since
Coordinates
28.7858, -97.0101
County
Victoria, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Tres Power Victoria LLC | Tres Power Victoria | — |
| Owner(s) | Tres Power Victoria LLC | Tres Power Victoria | — |
| Status | Operating | — | — |
Tres City Power LLC is a 100 MW natural gas-fired power plant located in Victoria County, Texas. The plant began operating in 2020 and is owned and operated by Tres Power Victoria LLC. It consists of two natural gas-fired combustion turbine generators. The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority.
In its most recent year of operation, Tres City Power generated 35,282 MWh of electricity, resulting in a capacity factor of 4.0%. The plant is ranked 142 out of 144 power plants in Texas and 941 out of 945 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
2.6K MWh
Latest Month
35.3K MWh
Annual Generation
4.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →CO₂ Intensity
1097 lb/MWh
NOx
0.108 lb/MWh
SO₂
0.005 lb/MWh
CH₄
0.023 lb/MWh
N₂O
0.002 lb/MWh
Capacity Factor
5.0%
Annual Net Gen
43 GWh
CO₂eq
1098 lb/MWh
Subregion
ERCOT All
2020
$1,116/kW
Est. Construction Cost
Total estimated cost: $111.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Victoria Switching Station · 138 kV
Substation Distance
< 10 km
Operator
American Electric Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_SOUTH
Alt. Hub / Zone
LZ_SOUTH
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
Last updated 2026-03-26