4.8 MW Landfill Gas operating in Brown, OH
4.8 MW
Nameplate Capacity
3
Generators
units
Landfill Gas
Technology
2017
Operating Since
Coordinates
38.8950, -83.9030
County
Brown, OH
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Energy Developments, Inc d/b/a EDL | — | — |
| Owner(s) | Energy Developments, Inc d/b/a EDL | — | — |
| Status | Operating | — | — |
Brown County LFGTE Power Station is a 4.8 MW landfill gas-fueled power plant located in Brown County, Ohio. The facility began operating in 2017 and is owned and operated by Energy Developments, Inc, doing business as EDL. The plant consists of 3 generators utilizing landfill gas technology.
The power station operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. In terms of landfill gas plants, Brown County LFGTE Power Station ranks 3rd out of 7 such facilities in Ohio, and 108th out of 284 nationally. The plant's latest annual generation was 28,169 MWh, achieving a capacity factor of 66.8%.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
35.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
1.9K MWh
Latest Month
28.2K MWh
Annual Generation
66.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.359 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
64.1%
Annual Net Gen
27 GWh
CO₂eq
0.000 lb/MWh
Subregion
RFC West
2017
$4,116/kW
Est. Construction Cost
Total estimated cost: $19.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
PJM
LMP Node
08BROWN 33 KV BROWNLF
Pricing Hub
AEP-DAYTON HUB
Location Type
Generation Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Brown County LFGTE Power StationForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo