Search plants, projects, owners, and states
18.6 MW Natural Gas operating in Leon, FL
18.6 MW
Nameplate Capacity
2
Generators
units
Natural Gas Internal Combustion Engine
Technology
2018
Operating Since
Coordinates
30.4598, -84.2605
County
Leon, FL
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Tallahassee - (FL) | City of Tallahassee - (FL) | — |
| Owner(s) | City of Tallahassee - (FL) | City of Tallahassee - (FL) | — |
| Status | Operating | — | — |
Sub 12 is a natural gas-fired power plant located in Leon County, Florida. The plant, owned and operated by the City of Tallahassee, has a total capacity of 18.6 MW. It consists of two natural gas internal combustion engine generators. The plant began operating in 2018.
In the most recent year with available data, Sub 12 generated 28,632 MWh of electricity, achieving a capacity factor of 17.5%. The plant operates within the City of Tallahassee balancing authority and is located in the SERC NERC region. Based on capacity, Sub 12 is ranked 58 out of 68 power plants in Florida, and 1328 out of 1963 plants nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
Bilateral Market
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
City of Tallahassee (TAL)
Grid Voltage
115.0 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
1.9K MWh
Latest Month
28.6K MWh
Annual Generation
17.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1055 lb/MWh
NOx
24 lb/MWh
SO₂
0.029 lb/MWh
CH₄
0.020 lb/MWh
N₂O
0.002 lb/MWh
Capacity Factor
9.6%
Annual Net Gen
16 GWh
CO₂eq
1056 lb/MWh
Subregion
FRCC All
2018
$837/kW
Est. Construction Cost
Total estimated cost: $15.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Sub 12Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.