154 MW Wind operating in Deuel, SD
154 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2021
Operating Since
Coordinates
44.6232, -96.6986
County
Deuel, SD
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Tatanka Ridge LLC | Avangrid Renewables; WEC Energy Group | — |
| Owner(s) | Avangrid Power LLC, WEC Energy Group | Avangrid | — |
| Status | Operating | operating | — |
Tatanka Ridge is a 154 MW wind power plant located in Deuel County, South Dakota. The facility, which began operating in 2021, is owned by Avangrid and operated by Tatanka Ridge LLC. It consists of a single generator utilizing onshore wind turbine technology. The plant uses GE2.8-127 wind turbines manufactured by GE Wind, with a hub height of 89 meters and a rotor diameter of 127 meters.
In its most recent year of operation, Tatanka Ridge generated 593,774 MWh of electricity, achieving a capacity factor of 44.1%. The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the MRO NERC region. Tatanka Ridge is the 12th largest power plant in South Dakota out of 14, and ranks 463rd nationally out of 734 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Investor-Owned Utility
Sector
IPP Non-CHP
53.3K MWh
Latest Month
593.8K MWh
Annual Generation
44.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2021
$1,562/kW
Est. Construction Cost
Total estimated cost: $240.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
MISO
LMP Node
OTP.TATANKARID
Pricing Hub
MINN.HUB
Location Type
Generation Node
Node Source
EIA-860 direct report
Last updated 2026-03-26