Search plants, projects, owners, and states
79.7 MW Wind operating in Lewis, NY
79.7 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2021
Operating Since
Coordinates
43.7096, -75.6162
County
Lewis, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Avangrid Power LLC | Avangrid Renewables | — |
| Owner(s) | Avangrid Power LLC | Avangrid | — |
| Status | Operating | operating | — |
Roaring Brook, LLC is a 79.7 MW wind power plant located in Lewis County, New York. The facility began operating in 2021 and is owned by Avangrid, with Avangrid Power LLC serving as the operator. The plant utilizes a single generator consisting of multiple onshore wind turbines manufactured by Siemens Gamesa Renewable Energy, model SG-4.44-145. These turbines have a rotor diameter of 145 meters and a hub height of 107.5 meters.
In its most recent year of operation, Roaring Brook generated 207,818 MWh of electricity, achieving a capacity factor of 29.7%. The plant is connected to the New York Independent System Operator (NYISO) balancing authority and operates within the Northeast Power Coordinating Council (NPCC) NERC region. Roaring Brook is ranked as the 29th largest power plant in New York out of 45, and nationally it is ranked 819 out of 1424.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
25.9K MWh
Latest Month
207.8K MWh
Annual Generation
29.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2021
$2,863/kW
Est. Construction Cost
Total estimated cost: $228.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
NYISO
LMP Node
ROARING___BROOK_WT_PWR
Pricing Hub
NYISO Zone D
Location Type
Generator
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Roaring Brook, LLCForward forecasts, scenario decomposition, and risk-decision tooling for this asset.