1.2 MW Hydro operating in Clackamas, OR
1.2 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
2018
Operating Since
Coordinates
45.3705, -121.7565
County
Clackamas, OR
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Portland General Electric Co | Portland General Electric | — |
| Owner(s) | Portland General Electric Co | Portland General Electric | — |
| Status | Operating | — | — |
Timothy Lake Powerhouse is a hydroelectric generating facility located in Clackamas County, Oregon. The plant is owned and operated by Portland General Electric (PGE). Commissioned in 2018, it has a total capacity of 1.2 MW from a single generator utilizing conventional hydroelectric technology. The plant's primary fuel source is water (WAT).
In the most recent year of data, Timothy Lake Powerhouse generated 2,050 MWh of electricity, achieving a capacity factor of 19.6%. The plant operates within the Portland General Electric Company balancing authority, in the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, Timothy Lake Powerhouse ranks as the 57th largest power plant in Oregon out of 63, and 1402nd nationally out of 1464.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Portland General Electric Company (PGE)
Grid Voltage
115.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
83 MWh
Latest Month
2.0K MWh
Annual Generation
19.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2018
$5,312/kW
Est. Construction Cost
Total estimated cost: $6.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
154 buyers • 8,584 active contracts
+ 149 more offtakers in the full bridge. Top 5 shown.
Browse source data on FERC EQRNo insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Timothy Lake PowerhouseForward forecasts, scenario decomposition, and risk-decision tooling for this asset.