161 MW Batteries (20 MW) + Natural Gas Fired Combustion Turbine (141 MW) operating in Orange, CA
161 MW
Nameplate Capacity
4
Generators
units
Hybrid (2)
Technology
Batteries + Natural Gas Fired Combustion Turbine
2020
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
33.8068, -117.9865
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
Orange, CA
Nearby Plants
An endpoint uses a short spatial match; the actual terminal connection remains unconfirmed.
2 mapped line sections connect the two facilities over 0.332 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Wellhead Services, Inc | Wellhead Services | — |
| Owner(s) | W Power LLC, Wellhead Services, Inc | Wellhead Electric Company | — |
| Status | Operating | — | — |
Summary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
The Stanton Energy Reliability Center Hybrid is a 161 MW hybrid power plant located in Orange County, California. The plant, which began operating in 2020, is owned by Wellhead Electric Company and operated by Wellhead Services, Inc. It utilizes both natural gas-fired combustion turbines and batteries as its energy sources. The facility includes 4 generators and a 4.5 MWh battery energy storage system (BESS) with a 0.45-hour duration, employing lithium-ion battery chemistry.
The plant's primary fuel is listed as MWH. In its latest year of operation, the Stanton Energy Reliability Center Hybrid generated 1,832 MWh of electricity, resulting in a capacity factor of 0.1%. The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. It is ranked 80th out of 112 power plants in California and 366th out of 514 nationally.
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
66.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
104 MWh
Latest Month
1.8K MWh
Annual Generation
0.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1598 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
0.144 lb/MWh
SO₂
0.004 lb/MWh
CH₄
0.030 lb/MWh
N₂O
0.003 lb/MWh
Capacity Factor
0.2%
Annual Net Gen
2 GWh
CO₂eq
1599 lb/MWh
Subregion
WECC California
2020
$758/kW
Est. Construction Cost
Total estimated cost: $122.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
CAISO
LMP Node
STANTNG2_7_N002
Pricing Hub
TH_SP15_GEN-APND
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesBattery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Stanton Energy Reliability Center Hybrid
Data-driven briefing on Stanton Energy Reliability Center Hybrid — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.