20 MW BESS operating in McHenry, IL
20 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2016
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
42.3312, -88.2734
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
McHenry, IL
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
3 mapped line sections connect the two facilities over 9.260 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | McHenry Battery Storage | — | — |
| Owner(s) | McHenry Battery Storage | — | — |
| Status | Operating | — | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
McHenry Battery Storage is a 20 MW battery energy storage system located in McHenry County, Illinois. The plant, which began operating in 2016, is owned and operated by McHenry Battery Storage. It consists of a single generator utilizing battery technology with lithium-ion (LIB) chemistry. The storage capacity of the battery system is 7.8 MWh, providing a duration of approximately 0.39 hours at full output.
The McHenry Battery Storage facility operates within the PJM Interconnection, LLC balancing authority, which falls under the SERC NERC region. As of the latest rankings, it is the 8th largest of 12 battery storage facilities in Illinois and ranks 695th out of 1205 nationally. The plant's primary fuel source is electricity (MWH), indicating it charges from the grid.
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
35.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
−282 MWh
Net Charging
-282 MWh
Annual Net Energy
-0.2%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2016
$1,763/kW
Est. Construction Cost
Total estimated cost: $35.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
McHenry Substation · 138 kV
Substation Distance
< 10 km
Operator
Commonwealth Edison
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
193 MCHE34.5 KV L7544
Pricing Hub
N ILLINOIS HUB
Node Source
EIA-860 direct report
1 buyer • 2 active contracts
Last updated 2026-03-26
View all articlesOE IL Solar 3
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
McHenry Battery Storage
Data-driven briefing on McHenry — fleet, generation, financial, and news signals.
OE IL Solar 3
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.