Search plants, projects, owners, and states
150 MW Solar operating in Upton, TX
150 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2017
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
31.2461, -102.2795
Reference point calculated from the selected footprint.
PV array footprint
Array footprint from USGS/LBNL imagery. It is not the complete site or a legal parcel.
Source imagery: 2022-03-17.
County
Upton, TX
Nearby Plants
An endpoint uses a short spatial match; the actual terminal connection remains unconfirmed.
1 mapped line section connects the two facilities over 1.630 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
Sources can describe different roles or reporting dates. The source-specific values below are retained for comparison.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | RWE Americas, LLC | Consolidated Edison Development Inc. | — |
| Owner(s) | RWE Clean Energy | Consolidated Edison Development Inc. | — |
| Status | Operating | operating | — |
Summary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Upton County Solar is a 150 MW solar photovoltaic power plant located in Upton County, Texas. The plant began operating in 2017 and has one generator. It is owned and operated by Consolidated Edison Development Inc. The facility utilizes single-axis tracking to maximize solar energy capture. Upton County Solar is connected to the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority.
In its most recent year of operation, Upton County Solar generated 299,145 MWh of electricity, achieving a capacity factor of 22.8%. The plant holds a rank of 147 out of 192 power plants in Texas and 387 out of 639 nationally. Financial data indicates a power purchase agreement (PPA) price of $36.36 per MWh.
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
19.2K MWh
Latest Month
299.1K MWh
Annual Generation
22.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Historic financial signal for this asset — PPA, LCOE, market value where reported. The base for forward bankability and insurance analytics on the InfraSure platform.
Data from 2017–2024
$23.6/MWh
Energy Value
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Upton County Solar 1 Substation · 138 kV
Substation Distance
1.797 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
SPTX12B_RN
Pricing Hub
HB_WEST
Alt. Hub / Zone
LZ_WEST
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-14
View all articlesEdison 0203 Community Solar - SLNNJ203
Data-driven briefing on Edison — fleet, generation, financial, and news signals.
RP SCG Texas Solar
Summary analysis with parallel narrative sections and visualizations.
Upton County Solar
Data-driven briefing on Upton County Solar — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.