Search plants, projects, owners, and states
9.5 MW Waste Heat operating in Washington, UT
9.5 MW
Nameplate Capacity
1
Generators
unit
All Other
Technology
2016
Operating Since
Coordinates
37.3480, -113.7650
County
Washington, UT
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Utah Associated Mun Power Sys | — | — |
| Owner(s) | Utah Associated Mun Power Sys | — | — |
| Status | Operating | — | — |
The Veyo Heat Recovery Project is a 9.5 MW waste heat power plant located in Washington County, Utah. It began operating in 2016 and is owned and operated by Utah Associated Mun Power Sys. The plant utilizes "All Other" technology to generate electricity from waste heat (WH). It is the largest waste heat plant in Utah, and ranks 23rd nationally among plants of that type.
The plant operates within the PacifiCorp - East balancing authority, which is part of the Western Electricity Coordinating Council (WECC) NERC region. In its most recent year of operation, the Veyo Heat Recovery Project generated 38,961 MWh of electricity, achieving a capacity factor of 46.7%.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
PacifiCorp - East (PACE)
Grid Voltage
34.5 kV
Regulatory Status
RE — Regulated
Entity Type
Political Subdivision
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
3.1K MWh
Latest Month
39.0K MWh
Annual Generation
46.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
No financial data available for this plant.
This is the open data foundation underneath InfraSure's analytical layer — if you have sources or want more coverage here, drop a note.
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Veyo Heat Recovery ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.