Search plants, projects, owners, and states
151.2 MW Wind operating in Floyd, TX
151.2 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2017
Operating Since
Coordinates
34.0277, -101.1624
County
Floyd, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Old Settler Wind, LLC | Apex Clean Energy | — |
| Owner(s) | Old Settler Wind, LLC | Northleaf Capital Partners | — |
| Status | Operating | operating | — |
GEM identifies the owner as Northleaf Capital Partners
This entity is not yet in the GEM ownership database — chain unavailable.
Old Settler Wind is a 151.2 MW wind power plant located in Floyd County, Texas. The facility began operating in 2017 and is owned and operated by Old Settler Wind, LLC. The plant consists of a single generator utilizing onshore wind turbine technology. It is interconnected to the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority.
The plant's wind turbines have a hub height of 80 meters and a rotor diameter of 107 meters. The turbines were manufactured by GE Wind, model GE2.4-107. In its most recent year of operation, Old Settler Wind generated 544,422 MWh, achieving a capacity factor of 41.1%. The plant ranks 153rd out of 200 wind facilities in Texas, and 473rd out of 734 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
59.0K MWh
Latest Month
544.4K MWh
Annual Generation
41.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2017
$1,486/kW
Est. Construction Cost
Total estimated cost: $224.7M
Market Position
ISO/RTO Market
ERCOT
LMP Node
COTPLNS_RN
Pricing Hub
HB_WEST
Alt. Hub / Zone
LZ_WEST
Location Type
Resource Node
Node Source
EIA-860 direct report
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Old Settler Wind