Search plants, projects, owners, and states
80 MW Wind operating in Converse, WY
80 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2016
Operating Since
Coordinates
42.7282, -105.8668
County
Converse, WY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AES Distributed Energy | Sustainable Power Group | — |
| Owner(s) | AES Distributed Energy | Sustainable Power Group LLC | — |
| Status | Operating | operating | — |
Pioneer Wind Park, LLC is an 80 MW wind power plant located in Converse County, Wyoming. The facility began operating in 2016 and is owned and operated by AES Distributed Energy. The plant utilizes a single generator consisting of onshore wind turbines. It is interconnected to the grid within the PacifiCorp - East balancing authority, which falls under the Western Electricity Coordinating Council (WECC) NERC region.
The plant's wind turbines have a hub height of 80 meters and a rotor diameter of 87 meters. The turbines were manufactured by GE Wind, and the model is GE1.85-87. In its most recent year of operation, Pioneer Wind Park generated 273,017 MWh of electricity, achieving a capacity factor of 38.9%. The plant ranks 26th out of 34 wind facilities in Wyoming and 805th out of 1424 wind facilities nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
PacifiCorp - East (PACE)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
36.5K MWh
Latest Month
273.0K MWh
Annual Generation
38.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2016
$1,705/kW
Est. Construction Cost
Total estimated cost: $136.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Pioneer Wind Park, LLCForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo