2.2 MW Batteries (1 MW) + Other Waste Biomass (1 MW) operating in San Mateo, CA
2.2 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Other Waste Biomass
2015
Operating Since
Coordinates
37.5426, -122.2311
County
San Mateo, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Silicon Valley Clean Water | — | — |
| Owner(s) | Silicon Valley Clean Water | — | — |
| Status | Operating | — | — |
Silicon Valley Clean Water is a hybrid power plant located in San Mateo County, California. The plant, owned and operated by Silicon Valley Clean Water, has a total capacity of 2.2 MW and began operating in 2015. It utilizes both batteries and other waste biomass as energy sources, with two generators on site. The plant includes 2 MWh of battery energy storage with a duration of 2 hours, utilizing lithium-ion battery chemistry (LIB).
The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, Silicon Valley Clean Water ranks as the 262nd largest plant in California out of 300, and 1103rd nationally out of 1205. The latest annual generation data indicates an output of 7,018 MWh, resulting in a capacity factor of 36.3%.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
5.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Municipal
Sector
IPP CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
621 MWh
Latest Month
7.0K MWh
Annual Generation
36.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
32 lb/MWh
NOx
24 lb/MWh
SO₂
0.037 lb/MWh
CH₄
0.013 lb/MWh
N₂O
0.001 lb/MWh
Capacity Factor
24.5%
Annual Net Gen
5 GWh
CO₂eq
33 lb/MWh
Subregion
WECC California
2015
$913/kW
Est. Construction Cost
Total estimated cost: $2.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
CAISO
LMP Node
BELMONT_1_N001
Pricing Hub
TH_NP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Silicon Valley Clean WaterForward forecasts, scenario decomposition, and risk-decision tooling for this asset.