Search plants, projects, owners, and states
103 MW Wind operating in Grant, WV
103 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2016
Operating Since
Coordinates
39.2489, -79.1154
County
Grant, WV
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | New Creek Wind, LLC | Enbridge Inc | — |
| Owner(s) | New Creek Wind, LLC | Enbridge | — |
| Status | Operating | operating | — |
New Creek Wind is a 103 MW wind power plant located in Grant County, West Virginia. The facility began operating in 2016 and is owned by Enbridge, a Canadian company. The operator listed with the EIA is New Creek Wind, LLC. The plant utilizes a single generator consisting of multiple onshore wind turbines. Specifically, the plant uses Gamesa G97-2.1 model turbines, with a rotor diameter of 97 meters and a hub height of 78 meters.
The plant's latest annual generation was 292,693 MWh, resulting in a capacity factor of 32.5%. New Creek Wind operates within the PJM Interconnection, LLC balancing authority and the SERC NERC region. It is the third-largest of four wind plants in West Virginia, and ranks 678th out of 734 wind plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
500.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
28.5K MWh
Latest Month
292.7K MWh
Annual Generation
32.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2016
$1,611/kW
Est. Construction Cost
Total estimated cost: $165.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
New Creek Wind Substation · 500 kV
Substation Distance
0 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
BISMARK 34.5 KV NEWCRKBT
Pricing Hub
AEP-DAYTON HUB
Alt. Hub / Zone
WESTERN HUB
Location Type
Generation Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about New Creek WindForward forecasts, scenario decomposition, and risk-decision tooling for this asset.