47.4 MW Hydro operating in Meigs, OH
47.4 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
1982
Operating Since
Coordinates
38.9153, -81.9082
County
Meigs, OH
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Eagle Creek Renewable Energy, LLC | Eagle Creek Renewable Energy | — |
| Owner(s) | Eagle Creek Racine Hydro, LLC | American Electric Power Company | — |
| Status | Operating | operating | — |
The Racine hydroelectric plant, located in Meigs County, Ohio, has a total capacity of 47.4 MW. The plant began operating in 1982 and utilizes conventional hydroelectric technology with water as its primary fuel source. It consists of two generators. American Electric Power Company is the parent company, while Eagle Creek Renewable Energy, LLC is the plant's operator.
Racine is the second-largest hydroelectric plant in Ohio, and ranks 309th nationally out of 1464 hydroelectric facilities. The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. In the most recent year with available data, the plant generated 174,759 MWh, achieving a capacity factor of 41.9%.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
26.2K MWh
Latest Month
174.8K MWh
Annual Generation
41.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $108.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
PJM
LMP Node
RACINE 8 KV RA1
Pricing Hub
AEP-DAYTON HUB
Location Type
Generation Node
Node Source
Curated node match
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about RacineForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo