36 MW BESS operating in LaSalle, IL
36 MW
Nameplate Capacity
2
Generators
units
Batteries
Technology
2013
Operating Since
Coordinates
41.2269, -88.6836
County
LaSalle, IL
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Invenergy Services LLC | Invenergy Services | — |
| Owner(s) | Invenergy Services LLC | Invenergy | — |
| Status | Operating | — | — |
The Grand Ridge Battery Projects, located in LaSalle County, Illinois, is a 36 MW battery energy storage system (BESS) owned and operated by Invenergy. The plant began operating in 2013 and consists of two generators utilizing battery technology. The primary fuel source is listed as MWH, indicating it draws power from the grid to charge the batteries. The BESS has a total storage capacity of 1 MWh, with a duration of 0.22 hours, and utilizes lithium-ion battery chemistry.
The Grand Ridge Battery Projects operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. According to available data, it is ranked as the 7th largest battery storage facility in Illinois out of 12, and 640th nationally out of 1205.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
−358 MWh
Net Charging
-3.6K MWh
Annual Net Energy
-1.2%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$913/kW
Est. Construction Cost
Total estimated cost: $32.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
941 GRND34.5 KV GRIDG2BS
Pricing Hub
N ILLINOIS HUB
Location Type
Generation Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-04-09
View all 5 articlesNo Ask reports yet for this entity.
Ask about Grand Ridge Battery ProjectsForward forecasts, scenario decomposition, and risk-decision tooling for this asset.