Search plants, projects, owners, and states
80 MW Solar operating in Iron, UT
80 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2016
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
37.7258, -113.1623
Reference point calculated from the selected footprint.
PV array footprint
Array footprint from USGS/LBNL imagery. It is not the complete site or a legal parcel.
Source imagery: 2021-07-03.
County
Iron, UT
Nearby Plants
The line is mapped. The plant’s electrical connection and official point of interconnection still need confirmation.
1 mapped line section connects the two facilities over 9.279 km. The line reaches both facility footprints in the source data.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Clearway Renewable Operation & Maintenance LLC | Clearway Energy Group | — |
| Owner(s) | Clearway Energy, Inc | Clearway Energy | — |
| Status | Operating | operating | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Iron Springs Solar, LLC is an 80 MW solar photovoltaic power plant located in Iron County, Utah. The plant began operating in 2016 and is owned by Clearway Energy, with Clearway Renewable Operation & Maintenance LLC as the operator. It utilizes a single-axis tracking system to maximize solar energy capture. The plant is connected to the PacifiCorp - East balancing authority within the Western Electricity Coordinating Council (WECC) NERC region. Iron Springs Solar is ranked as the 15th largest solar plant in Utah out of 58, and 702nd nationally out of 7108.
In its most recent year of operation, Iron Springs Solar generated 213,555 MWh of electricity, achieving a capacity factor of 30.5%. Financial data indicates that the plant's construction costs and power purchase agreement (PPA) details are available from LBNL solar data sources.
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
PacifiCorp - East (PACE)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
9.9K MWh
Latest Month
213.6K MWh
Annual Generation
30.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Historic financial signal for this asset — PPA, LCOE, market value where reported. The base for forward bankability and insurance analytics on the InfraSure platform.
Data from 2016–2024
$15.8/MWh
Energy Value
$11.9/MWh
Capacity Value
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
1 buyer • 11 active contracts
Last updated 2026-04-09
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this asset.