15 MW Natural Gas operating in Frederick, VA
15 MW
Nameplate Capacity
1
Generators
unit
Natural Gas Fired Combustion Turbine
Technology
2015
Operating Since
Coordinates
39.1270, -78.1878
County
Frederick, VA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | HP Hood LLC | — | — |
| Owner(s) | HP Hood LLC | — | — |
| Status | Operating | — | — |
HP Hood CT is a 15 MW natural gas-fired combustion turbine power plant located in Frederick County, Virginia. The plant began operating in 2015 and is owned and operated by HP Hood LLC. It consists of a single generator. The plant operates within the PJM Interconnection, LLC balancing authority, which is part of the ReliabilityFirst Corporation (RFC) NERC region.
In the most recent year of data, HP Hood CT generated 109,697 MWh of electricity, achieving a capacity factor of 83.5%. The plant is ranked as the 24th largest in Virginia out of 28 plants, and nationally it is ranked 1371 out of 1963.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
Industrial CHP
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
9.3K MWh
Latest Month
109.7K MWh
Annual Generation
83.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
584 lb/MWh
NOx
2 lb/MWh
SO₂
0.016 lb/MWh
CH₄
0.011 lb/MWh
N₂O
0.001 lb/MWh
Capacity Factor
70.4%
Annual Net Gen
92 GWh
CO₂eq
585 lb/MWh
Subregion
RFC West
2015
$812/kW
Est. Construction Cost
Total estimated cost: $12.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
BARTONVI 34.5 KV HPHOODCT
Pricing Hub
DOMINION HUB
Alt. Hub / Zone
WESTERN HUB
Node Source
EIA-860 direct report
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about HP Hood CTForward forecasts, scenario decomposition, and risk-decision tooling for this asset.