Search plants, projects, owners, and states
1 MW Solar operating in Jefferson, GA
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2014
Operating Since
Coordinates
32.8834, -82.4100
County
Jefferson, GA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Luminace Solar Georgia, LLC | Luminace Solar Georgia | Georgia Power |
| Owner(s) | Luminace Solar Georgia, LLC | — | — |
| Status | Operating | operating | — |
Located in Jefferson County, Georgia, the Georgia Power at Wadley GA solar photovoltaic plant has a total capacity of 1 MW. The plant began operating in 2014 and is operated by Luminace Solar Georgia, LLC. It consists of a single generator using fixed tilt solar tracking technology. The plant's primary fuel source is solar energy.
In the most recent year of data, the plant generated 1,874 MWh of electricity, achieving a capacity factor of 21.3%. The plant operates within the Southeastern Power Administration balancing authority and the SERC NERC region. Based on capacity, the plant ranks 162 out of 164 power plants in Georgia, and 6368 out of 7108 plants nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
Bilateral Market
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Southeastern Power Administration (SEPA)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
126 MWh
Latest Month
1.9K MWh
Annual Generation
21.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2014
$2,217/kW
Est. Construction Cost
Total estimated cost: $2.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Georgia Power at Wadley GAForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo