3 MW Solar operating in Iron, UT
3 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2015
Operating Since
Coordinates
37.7517, -113.2520
County
Iron, UT
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SunE Solar XVII Project 1, LLC | SunE Solar XVII Project 1 | — |
| Owner(s) | SunE Solar XVII Project 1, LLC | — | — |
| Status | Operating | operating | — |
Fiddler's Canyon #1 is a 3 MW solar photovoltaic power plant located in Iron County, Utah. The plant, which began operating in 2015, is owned and operated by SunE Solar XVII Project 1, LLC. It consists of a single generator utilizing single-axis tracking technology to maximize solar energy capture. The plant is interconnected to the grid within the PacifiCorp - East balancing authority, operating within the Western Electricity Coordinating Council (WECC) NERC region.
In its most recent year of operation, Fiddler's Canyon #1 generated 7,313 MWh of electricity, achieving a capacity factor of 27.7%. The plant's primary fuel source is solar energy. Fiddler's Canyon #1 ranks as the 51st largest power plant in Utah out of 58 plants, and nationally it ranks 3968 out of 7108.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
PacifiCorp - East (PACE)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
343 MWh
Latest Month
7.3K MWh
Annual Generation
27.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Historic financial signal for this asset — PPA, LCOE, market value where reported. The base for forward bankability and insurance analytics on the InfraSure platform.
Data from 2016–2024
$15.6/MWh
Energy Value
$11.8/MWh
Capacity Value
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Fiddler's Canyon #1Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.