5.8 MW Bio. Gas operating in Newaygo, MI
5.8 MW
Nameplate Capacity
2
Generators
units
Other Waste Biomass
Technology
2012
Operating Since
Coordinates
43.4597, -85.9761
County
Newaygo, MI
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Generate Fremont Digester, LLC. | — | — |
| Owner(s) | Generate Fremont Digester, LLC. | — | — |
| Status | Operating | — | — |
Fremont Community Digester, LLC, located in Newaygo County, Michigan, is a 5.8 MW power plant fueled by other waste biomass (OBG). The plant began operating in 2012 and is operated by Generate Fremont Digester, LLC. It consists of two generators utilizing "Other Waste Biomass" technology. The facility is connected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and resides within the ReliabilityFirst Corporation (RFC) NERC region.
In its latest year of reported generation, the plant produced 375 MWh of electricity, operating at a capacity factor of 0.7%. Fremont Community Digester holds the rank of 1 out of 2 similar plants in Michigan and is ranked 15 out of 74 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
46.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP CHP
26 MWh
Latest Month
375 MWh
Annual Generation
0.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →CO₂ Intensity
0 lb/MWh
NOx
25 lb/MWh
SO₂
0.039 lb/MWh
CH₄
0.014 lb/MWh
N₂O
0.001 lb/MWh
Capacity Factor
21.5%
Annual Net Gen
11 GWh
CO₂eq
0.754 lb/MWh
Subregion
RFC Michigan
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $20.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Fremont Digester Substation · 46 kV
Substation Distance
< 10 km
Operator
Consumers Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MICHIGAN.HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Fremont Community Digester, LLCForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo