Search plants, projects, owners, and states
832.3 MW Natural Gas operating in Carroll, OH
832.3 MW
Nameplate Capacity
3
Generators
units
Natural Gas Fired Combined Cycle
Technology
2017
Operating Since
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Carroll County Energy LLC | Carroll County Energy | — |
| Owner(s) | Carroll County Energy LLC | Advanced Power | — |
| Status | Operating | — | — |
Carroll County Energy is an 832.3 MW natural gas-fired combined cycle power plant located in Carroll County, Ohio. The plant began operating in 2017 and consists of 3 generators. It is owned by Advanced Power, a company based in Switzerland, and operated by Carroll County Energy LLC. The plant is connected to the PJM Interconnection, LLC balancing authority and resides within the RFC NERC region.
In terms of Ohio power plants, Carroll County Energy ranks 9th out of 25 in size, and nationally it ranks 230th out of 945. The plant's latest annual generation was 5,270,057 MWh, resulting in a capacity factor of 72.4%.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
508.2K MWh
Latest Month
5.3M MWh
Annual Generation
72.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
876 lb/MWh
NOx
0.042 lb/MWh
SO₂
0.004 lb/MWh
CH₄
0.016 lb/MWh
N₂O
0.002 lb/MWh
Capacity Factor
75.6%
Annual Net Gen
5513 GWh
CO₂eq
877 lb/MWh
Subregion
RFC West
2017
$920/kW
Est. Construction Cost
Total estimated cost: $765.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
1292915936
Pricing Hub
AEP-DAYTON HUB
Alt. Hub / Zone
WESTERN HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-14
View all 6 articlesNo Ask reports yet for this entity.
Ask about Carroll County EnergyForward forecasts, scenario decomposition, and risk-decision tooling for this asset.