Search plants, projects, owners, and states
6.4 MW Landfill Gas operating in Sarasota, FL
6.4 MW
Nameplate Capacity
4
Generators
units
Landfill Gas
Technology
2015
Operating Since
Coordinates
27.2030, -82.3870
County
Sarasota, FL
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Landfill Energy Systems Florida | — | — |
| Owner(s) | Landfill Energy Systems Florida | — | — |
| Status | Operating | — | — |
The Sarasota County LFGTE Facility is a 6.4 MW landfill gas-to-energy (LFGTE) power plant located in Sarasota County, Florida. The plant began operating in 2015 and is owned and operated by Landfill Energy Systems Florida. It utilizes four generators to convert landfill gas into electricity. The facility ranks fourth out of 12 LFGTE plants in Florida and 69th out of 284 such plants nationally.
In its most recent year of operation, the Sarasota County LFGTE Facility generated 29,979 MWh of electricity, achieving a capacity factor of 53.3%. The plant operates within the balancing authority of Florida Power & Light Company and is located within the SERC NERC region.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
Bilateral Market
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Florida Power & Light Company (FPL)
Grid Voltage
13.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
2.6K MWh
Latest Month
30.0K MWh
Annual Generation
53.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.408 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
49.6%
Annual Net Gen
28 GWh
CO₂eq
0.000 lb/MWh
Subregion
FRCC All
2015
$1,531/kW
Est. Construction Cost
Total estimated cost: $9.8M
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Sarasota County LFGTE Facility