Search plants, projects, owners, and states
94.3 MW Wind operating in Campbell, SD
94.3 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2015
Operating Since
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | RWE Clean Energy | Consolidated Edison | — |
| Owner(s) | Consolidated Edison Development Inc. | Consolidated Edison | — |
| Status | Operating | operating | — |
Campbell County Wind Farm is a 94.3 MW wind power facility located in Campbell County, South Dakota. The plant began operating in 2015 and is owned and operated by Consolidated Edison Development Inc., a subsidiary of Consolidated Edison. It is the 17th largest wind farm in South Dakota out of 24, and ranks 774th nationally out of 1424 wind facilities. The plant consists of a single generator utilizing onshore wind turbine technology.
The wind farm's turbines have a hub height of 80 meters and a rotor diameter of 103 meters. The turbines were manufactured by GE Wind, model GE1.7-103. In the most recent year of data, the plant generated 286,083 MWh of electricity, achieving a capacity factor of 34.6%. The plant operates within the Southwest Power Pool (SPP) balancing authority and the Midwest Reliability Organization (MRO) NERC region.
Generated from EIA, GEM, and public data sources
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Southwest Power Pool (SWPP)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
24.6K MWh
Latest Month
286.1K MWh
Annual Generation
34.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2015
$1,667/kW
Est. Construction Cost
Total estimated cost: $157.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
SPP
LMP Node
WAUE.BEPM.CAMPBLCO
Pricing Hub
SPPNORTH_HUB
Location Type
Settlement Location
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Campbell County Wind FarmForward forecasts, scenario decomposition, and risk-decision tooling for this asset.