20 MW Solar operating in Riverside, CA
20 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2015
Operating Since
Coordinates
33.7400, -117.0106
County
Riverside, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AP North Lake I, LP | SunEdison | — |
| Owner(s) | AP North Lake I, LP | SunEdison Inc | — |
| Status | Operating | operating | — |
GEM identifies the owner as SunEdison Inc
This entity is not yet in the GEM ownership database — chain unavailable.
AP North Lake I, LP is a 20 MW solar photovoltaic power plant located in Riverside County, California. The plant, owned and operated by AP North Lake I, LP, began commercial operation in 2015. It utilizes a single-axis tracking system to maximize solar energy capture. The plant is interconnected to the California Independent System Operator (CAISO) balancing authority within the Western Electricity Coordinating Council (WECC) NERC region.
In its most recent year of operation, AP North Lake I, LP generated 39,644 MWh of electricity, achieving a capacity factor of 22.5%. The plant holds a rank of 174 out of 862 solar facilities in California, and a national rank of 1551 out of 7108. Financial data indicates a power purchase agreement (PPA) price of $91.36 per MWh, according to data from Lawrence Berkeley National Laboratory (LBNL).
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
33.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
2.1K MWh
Latest Month
39.6K MWh
Annual Generation
22.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →Data from 2015–2024
$10.4/MWh
Energy Value
$9.8/MWh
Capacity Value
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Stetson Substation · 115 kV
Substation Distance
< 10 km
Operator
Southern California Edison
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_SP15_GEN-APND
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about AP North Lake I, LPForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo