Search plants, projects, owners, and states
1.5 MW Solar operating in San Bernardino, CA
1.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2015
Operating Since
Coordinates
34.5481, -117.4644
County
San Bernardino, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Clean Focus Yield, LLC | Clean Focus Yield | — |
| Owner(s) | Clean Focus Yield, LLC | — | — |
| Status | Operating | operating | — |
Coronus Adelanto West 2 is a 1.5 MW solar photovoltaic power plant located in San Bernardino County, California. The plant began operating in 2015 and has one generator. It is owned and operated by Clean Focus Yield, LLC. The plant utilizes a fixed tilt solar tracking system.
The plant's latest annual generation was 3,315 MWh, resulting in a capacity factor of 25.2%. The plant is connected to the California Independent System Operator (CAISO) balancing authority and is within the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, Coronus Adelanto West 2 ranks as the 581st largest power plant in California out of 862, and 5704th nationally out of 7108.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
12.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
182 MWh
Latest Month
3.3K MWh
Annual Generation
25.2%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →Data from 2016–2024
$9.3/MWh
Energy Value
$8.8/MWh
Capacity Value
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Adelanto Converter Station · 500 kV
Substation Distance
< 10 km
Operator
Intermountain Power Agency
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
ROADWAY 1 NO13
Pricing Hub
TH_SP15_GEN-APND
Node Source
EIA-860 direct report
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Coronus Adelanto West 2Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo