10 MW Wind operating in Baker, OR
10 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2017
Operating Since
Coordinates
44.4181, -117.2550
County
Baker, OR
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Prospector | DE Shaw Renewable Investments (DESRI) | — |
| Owner(s) | Prospector | DE Shaw Renewable Investments (DESRI) | — |
| Status | Operating | operating | — |
GEM identifies the owner as DE Shaw Renewable Investments (DESRI)
This entity is not yet in the GEM ownership database — chain unavailable.
Prospector Windfarm (Burnt River) is a 10 MW wind power plant located in Baker County, Oregon. The plant began operating in 2017 and is owned and operated by Prospector. It utilizes a single onshore wind turbine generator. The primary fuel source is wind (WND). Prospector Windfarm is ranked as the 34th largest wind farm in Oregon out of 49, and 1147th nationally out of 1424.
The plant's wind turbine is a GE2.0-116 model manufactured by GE Wind, featuring a rotor diameter of 116 meters and a hub height of 80 meters. In its most recent year of operation, the plant generated 18,420 MWh of electricity, achieving a capacity factor of 21.0%. The balancing authority for Prospector Windfarm is the Idaho Power Company, and it operates within the Western Electricity Coordinating Council (WECC) NERC region.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
1.3K MWh
Latest Month
18.4K MWh
Annual Generation
21.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2017
$2,254/kW
Est. Construction Cost
Total estimated cost: $22.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Prospector Windfarm (Burnt River)Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demoIdaho Power Company (IPCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP