Search plants, projects, owners, and states
1.6 MW Wind operating in Solano, CA
1.6 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2014
Operating Since
Coordinates
38.2335, -122.0921
County
Solano, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Foundation HA Energy Generation, LLC | — | — |
| Owner(s) | Foundation HA Energy Generation, LLC | — | — |
| Status | Operating | — | — |
Located in Solano County, California, the Anheuser-Busch #2 wind power plant has a total capacity of 1.6 MW. The plant began operating in 2014 and is owned and operated by Foundation HA Energy Generation, LLC. It consists of a single onshore wind turbine generator. The plant utilizes a GE Wind GE1.85-82.5 turbine model, featuring a rotor diameter of 82.5 meters and a hub height of 80 meters.
In its most recent year of operation, Anheuser-Busch #2 generated 4,130 MWh of electricity, achieving a capacity factor of 29.4%. The plant is connected to the California Independent System Operator (CAISO) balancing authority and operates within the Western Electricity Coordinating Council (WECC) NERC region. Anheuser-Busch #2 ranks as the 107th largest power plant in California out of 116, and 1366th nationally out of 1424. The plant's primary fuel source is wind (WND).
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
12.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
Industrial Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
95 MWh
Latest Month
4.1K MWh
Annual Generation
29.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2014
$1,935/kW
Est. Construction Cost
Total estimated cost: $3.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
CAISO
LMP Node
CURTISS_1_N102
Pricing Hub
TH_NP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Anheuser-Busch #2Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.