1.5 MW Wind operating in Kent, RI
1.5 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2016
Operating Since
Coordinates
41.6956, -71.7208
County
Kent, RI
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | WED Coventry Three, LLC | — | — |
| Owner(s) | Narragansett Bay Commission | — | — |
| Status | Operating | — | — |
WED Coventry 3 is a 1.5 MW wind power plant located in Kent County, Rhode Island. The plant began operating in 2016 and is owned and operated by WED Coventry Three, LLC. It consists of a single onshore wind turbine. The plant is interconnected to the ISO New England Inc. balancing authority and operates within the NPCC NERC region. According to state rankings, the plant is the 16th largest of 20 wind facilities in Rhode Island. Nationally, it ranks 1399 out of 1424 wind plants.
The wind turbine at WED Coventry 3 is a Vensys82 model manufactured by Vensys, featuring a rotor diameter of 82.3 meters and a hub height of 85 meters. In the most recent year of data, the plant generated 2,220 MWh of electricity, achieving a capacity factor of 16.9%.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
620.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
299 MWh
Latest Month
2.2K MWh
Annual Generation
16.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2016
$1,646/kW
Est. Construction Cost
Total estimated cost: $2.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ISO-NE
LMP Node
—
Pricing Hub
.Z.RHODEISLAND
Node Source
OSM spatial match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about WED Coventry 3Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.