Search plants, projects, owners, and states
67.6 MW Wind operating in Archer, TX
67.6 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2014
Operating Since
Coordinates
33.4998, -98.4979
County
Archer, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | EDF Renewable Asset Holdings, Inc. | EDF Renewables | — |
| Owner(s) | RPG Windthorst-2 Investco, Windthorst-2 LLC | small shareholder(s) | — |
| Status | Operating | operating | — |
Windthorst-2 is a 67.6 MW wind power plant located in Archer County, Texas. The plant began operating in 2014 and utilizes a single generator consisting of onshore wind turbines. The primary fuel source is wind (WND). EDF Renewable Asset Holdings, Inc. is the plant's operator, while ownership is attributed to small shareholder(s).
The facility's wind turbines have a hub height of 80 meters and a rotor diameter of 108 meters. The turbines were manufactured by Siemens, model SWT-2.3-108. In its most recent year of reported generation, Windthorst-2 produced 169,490 MWh, achieving a capacity factor of 28.6%. The plant operates within the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority and the TRE NERC region. Windthorst-2 ranks 219th out of 245 wind plants in Texas and 863rd out of 1424 wind plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
0 MWh
Latest Month
169.5K MWh
Annual Generation
28.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2014
$1,650/kW
Est. Construction Cost
Total estimated cost: $111.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ERCOT
LMP Node
WNDTS2_UNIT1
Pricing Hub
HB_WEST
Alt. Hub / Zone
LZ_WEST
Location Type
Resource Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Windthorst-2Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.