Search plants, projects, owners, and states
30 MW Wind operating in Garrett, MD
30 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2015
Operating Since
Coordinates
39.3243, -79.3885
County
Garrett, MD
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Fair Wind Power Partners, LLC | Exelon | — |
| Owner(s) | Fair Wind Power Partners, LLC | Exelon | — |
| Status | Operating | operating | — |
Fair Wind is a 30 MW wind power plant located in Garrett County, Maryland. The plant began operating in 2015 and is owned by Exelon, with Fair Wind Power Partners, LLC as the listed operator. The facility consists of a single generator utilizing onshore wind turbine technology. The turbines have a hub height of 100 meters and a rotor diameter of 100 meters, and were manufactured by Nordex, model N100.
The plant's latest annual generation was 85,805 MWh, resulting in a capacity factor of 32.8%. Fair Wind operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. It is ranked as the 5th largest of 6 wind plants in Maryland, and 1019th out of 1424 wind plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
8.7K MWh
Latest Month
85.8K MWh
Annual Generation
32.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2015
$1,640/kW
Est. Construction Cost
Total estimated cost: $49.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
KELSOGAP34.5 KV FAIRWDWF
Pricing Hub
WESTERN HUB
Location Type
Generation Node
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Fair WindForward forecasts, scenario decomposition, and risk-decision tooling for this asset.