14.3 MW Wind operating in Coos, NH
14.3 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2016
Operating Since
Coordinates
44.4680, -71.2230
County
Coos, NH
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Jericho Power LLC | LS Power Development LLC | — |
| Owner(s) | Jericho Power LLC | LS Power Development | — |
| Status | Operating | operating | — |
Jericho Power is a 14.3 MW wind power plant located in Coos County, New Hampshire. The facility, which began operating in 2016, is owned by LS Power Development and operated by Jericho Power LLC. It consists of a single generator utilizing onshore wind turbine technology. The plant uses a GE Wind GE2.85-103 turbine model, with a rotor diameter of 103 meters and a hub height of 85 meters.
Jericho Power operates within the ISO New England Inc. balancing authority and the NPCC NERC region. In its latest year of reported generation, the plant produced 22,648 MWh of electricity, achieving a capacity factor of 18.1%. It ranks as the 5th largest wind farm in New Hampshire, and 1117th nationally out of 1424 wind plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
2.5K MWh
Latest Month
22.6K MWh
Annual Generation
18.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2016
$1,646/kW
Est. Construction Cost
Total estimated cost: $23.5M
Market Position
ISO/RTO Market
ISO-NE
LMP Node
UN.BERLN_NH13.8BURG
Pricing Hub
.Z.NEWHAMPSHIRE
Location Type
NETWORK NODE
Node Source
Curated node match
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Jericho Power