228 MW Wind operating in Willacy, TX
228 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2017
Operating Since
Coordinates
26.5210, -97.6847
County
Willacy, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | RWE Clean Energy | E.ON Climate & Renewables | — |
| Owner(s) | Big Sky Wind, LLC | RWE Renewables | — |
| Status | Operating | operating | — |
GEM identifies the owner as RWE Renewables
This entity is not yet in the GEM ownership database — chain unavailable.
Bruennings Breeze Wind Farm is a 228 MW wind power plant located in Willacy County, Texas. The facility, which began operating in 2017, is owned and operated by Big Sky Wind, LLC. It consists of a single generator utilizing onshore wind turbine technology. The plant is connected to the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority. Bruennings Breeze is ranked 68th out of 200 wind plants in Texas and 206th out of 734 nationally.
The wind farm's turbines have a hub height of 87.5 meters and a rotor diameter of 125 meters. The turbines were manufactured by Nordex and are model AW125/3000. In its most recent year of operation, the plant generated 524,937 MWh, achieving a capacity factor of 26.4%. Financial data indicates a power purchase agreement (PPA) price of $65.2 per MWh.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
28.6K MWh
Latest Month
524.9K MWh
Annual Generation
26.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Historic financial signal for this asset — PPA, LCOE, market value where reported. The base for forward bankability and insurance analytics on the InfraSure platform.
Big Sky Wind, LLC · Data from 2023–2025
$65.2/MWh
PPA Price
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Bruenning's Breeze Substation · 345 kV
Substation Distance
< 10 km
Operator
E.ON
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
BBREEZE_UNIT1, BBREEZE_UNIT2
Pricing Hub
HB_SOUTH
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.