9.6 MW Hydro planned in Ketchikan Gateway, AK
Outside CONUS — spatial-market dimensions not provided by this dataset.
9.6 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
Planned: —
Planned Operation
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
55.4194, -131.5378
Reference point reported to EIA.
County
Ketchikan Gateway, AK
Nearby Plants
The available map data does not yet establish a route from this plant to the grid.
No suitable mapped facility was found in the area searched. Missing map data does not mean the plant has no grid connection.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Ketchikan Electric Company | — | — |
| Owner(s) | Alaska Power and Telephone Co, Ketchikan Public Utilities | — | — |
| Status | Planned | — | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Mahoney Lake Hydroelectric is a 9.6 MW conventional hydroelectric power plant located in Ketchikan Gateway County, Alaska. The plant, owned and operated by Ketchikan Electric Company, utilizes water (WAT) as its primary fuel source. It consists of a single generator.
Mahoney Lake Hydroelectric ranks as the 13th largest hydroelectric facility out of 29 in the state of Alaska, and 678th out of 1464 nationally. Recent news coverage related to the plant has focused on hazards.
Grid Region
—
Market
—
NERC Region
—
Balancing Authority
—
Grid Voltage
34.5 kV
Regulatory Status
RE — Regulated
Entity Type
Independent Power Producer
Sector
Electric Utility
Connection evidence
Connection unresolved
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,415/kW
Est. Construction Cost
Total estimated cost: $13.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
BRP Aras BESS
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Mahoney Lake Hydroelectric
Data-driven briefing on Mahoney Lake Hydroelectric — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.