Search plants, projects, owners, and states
1 MW Wind operating in Cuyahoga, OH
1 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2012
Operating Since
Coordinates
41.6021, -81.4969
County
Cuyahoga, OH
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Case Western Reserve University | — | — |
| Owner(s) | Case Western Reserve University | — | — |
| Status | Operating | — | — |
The Euclid Farm, Stamco N-54 wind power plant is located in Cuyahoga County, Ohio. The plant has a total capacity of 1 MW and commenced operations in 2012. It is owned and operated by Case Western Reserve University. The facility consists of a single onshore wind turbine.
The plant utilizes a Northern Power Systems NPS-100 wind turbine with a hub height of 37 meters. In its most recent year of operation, the plant generated 710 MWh of electricity, resulting in a capacity factor of 8.1%. The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. In terms of size, the plant ranks 24th out of 24 wind plants in Ohio and 1419th out of 1424 wind plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
36.2 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
130 MWh
Latest Month
710 MWh
Annual Generation
8.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $1.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Babbitt Substation
Substation Distance
1.813 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
KIPLNG 138 KV TR71
Pricing Hub
AEP-DAYTON HUB
Alt. Hub / Zone
WESTERN HUB
Location Type
Load Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Euclid Farm, Stamco N-54Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.