1.6 MW Wind operating in Rice, MN
1.6 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2006
Operating Since
Coordinates
44.4624, -93.1925
County
Rice, MN
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | St. Olaf College | — | — |
| Owner(s) | St. Olaf College | — | — |
| Status | Operating | — | — |
The St. Olaf Wind Turbine is a 1.6 MW wind power facility located in Rice County, Minnesota. The plant, which began operating in 2006, is owned and operated by St. Olaf College. It utilizes a single onshore wind turbine. The turbine has a hub height of 80 meters and a rotor diameter of 82 meters. The turbine model is a Vestas V82-1.65.
In the most recent year of data, the St. Olaf Wind Turbine generated 2,582 MWh of electricity, achieving a capacity factor of 18.4%. The facility operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority. The plant ranks 111th out of 123 wind facilities in Minnesota, and 1367th out of 1424 nationally. The plant's primary fuel is wind (WND).
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
13.8 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Commercial
Sector
Commercial Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
192 MWh
Latest Month
2.6K MWh
Annual Generation
18.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $3.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
Shared substation inference
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about St. Olaf Wind TurbineForward forecasts, scenario decomposition, and risk-decision tooling for this asset.