17.7 MW Solar operating in Cochise, AZ
17.7 MW
Nameplate Capacity
2
Generators
units
Solar Photovoltaic
Technology
2014
Operating Since
Coordinates
31.5562, -110.3207
County
Cochise, AZ
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Tucson Electric Power Co | Tucson Electric Power | — |
| Owner(s) | Tucson Electric Power Co | Fortis | — |
| Status | Operating | operating | — |
The Fort Huachuca Solar PV Project is a 17.7 MW solar photovoltaic power plant located in Cochise County, Arizona. The plant began operating in 2014 and is owned by Fortis, a Canadian company. Tucson Electric Power Company (TEP) operates the facility and also serves as the balancing authority. The plant is interconnected within the Western Electricity Coordinating Council (WECC) NERC region. It ranks as the 39th largest solar plant in Arizona out of 93, and 1615th nationally out of 7108.
The facility consists of two solar photovoltaic generators utilizing fixed-tilt tracking. In its most recent year of operation, the plant generated 40,108 MWh of electricity, achieving a capacity factor of 25.8%. Financial data indicates an installed cost of $2,347.31 per kW.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Tucson Electric Power Company (TEPC)
Grid Voltage
13.8 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
3.0K MWh
Latest Month
40.1K MWh
Annual Generation
25.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Solar photovoltaic · Tucson Electric Power Company · Data from 2014–2024
$2,417/kW
Installed Cost
$19.8/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Fort Huachuca Solar PV ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.