302 MW Wind operating in Sangamon, IL
302 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2021
Operating Since
Coordinates
39.6898, -90.0538
County
Sangamon, IL
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Lincoln Land Wind, LLC | Apex Clean Energy | — |
| Owner(s) | Lincoln Land Wind, LLC | Ørsted | — |
| Status | Operating | operating | — |
Lincoln Land Wind is a 302 MW wind power plant located in Sangamon County, Illinois. The plant, which began operating in 2021, is owned by Ørsted, a company based in Denmark, and operated by Lincoln Land Wind, LLC. It utilizes a single generator consisting of onshore wind turbines. The facility is connected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and resides within the SERC NERC region.
The wind farm's turbines have a hub height of 114 meters and a rotor diameter of 127 meters. The turbines were manufactured by GE Wind, model GE2.82-127. In its most recent year of operation, Lincoln Land Wind generated 1,005,214 MWh of electricity, achieving a capacity factor of 38.1%. The plant is the second-largest of 44 wind farms in Illinois, and ranks 79th out of 734 wind plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
104.3K MWh
Latest Month
1.0M MWh
Annual Generation
38.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2021
$1,562/kW
Est. Construction Cost
Total estimated cost: $471.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
MISO
LMP Node
AMIL.LINCLAND1
Pricing Hub
ILLINOIS.HUB
Location Type
Generation Node
Node Source
Curated node match
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Lincoln Land WindForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo