Search plants, projects, owners, and states
110 MW Wind operating in Jack, TX
110 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2015
Operating Since
Coordinates
33.1504, -98.1640
County
Jack, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Keechi Wind, LLC | Enbridge Inc | — |
| Owner(s) | Keechi Wind, LLC | Enbridge | — |
| Status | Operating | operating | — |
Keechi Wind is a 110 MW wind power plant located in Jack County, Texas. The facility began operating in 2015 and is owned by Enbridge, a Canadian company. The operator listed with the EIA is Keechi Wind, LLC. The plant utilizes a single generator consisting of onshore wind turbines.
The facility's latest annual generation was 394,863 MWh, resulting in a capacity factor of 40.9%. Keechi Wind interconnects to the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority. The wind turbines have a hub height of 95 meters and a rotor diameter of 100 meters. The turbines were manufactured by Vestas, model V100-2.0. Keechi Wind ranks 197th out of 200 wind plants in Texas and 644th out of 734 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
30.8K MWh
Latest Month
394.9K MWh
Annual Generation
40.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2015
$1,640/kW
Est. Construction Cost
Total estimated cost: $180.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ERCOT
LMP Node
ERCOT Bus #562
Pricing Hub
HB_NORTH
Node Source
EIA-860 direct report
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Keechi WindForward forecasts, scenario decomposition, and risk-decision tooling for this asset.