194 MW Wind operating in Oldham, TX
194 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2015
Operating Since
Coordinates
35.3013, -102.7219
County
Oldham, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Boralex US Operations LLC | — | — |
| Owner(s) | Boralex US Operations LLC | — | — |
| Status | Operating | — | — |
Spinning Spur Wind III is a 194 MW wind power plant located in Oldham County, Texas. The plant began operating in 2015 and is owned and operated by Boralex US Operations LLC. It utilizes a single onshore wind turbine generator. The facility ranks 116th in size among Texas power plants and 378th nationally.
The plant uses Vestas V100-2.0 wind turbines, with a rotor diameter of 100 meters and a hub height of 80 meters. In its most recent year of operation, Spinning Spur Wind III generated 815,752 MWh of electricity, achieving a capacity factor of 47.9%. The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
63.5K MWh
Latest Month
815.8K MWh
Annual Generation
47.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2015
$1,640/kW
Est. Construction Cost
Total estimated cost: $318.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Spinning Spur 3 Substation · 345 kV
Substation Distance
4.014 km
Operator
Électricité de France
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
SSPURT_WIND1
Pricing Hub
HB_WEST
Alt. Hub / Zone
LZ_WEST
Location Type
Resource Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Spinning Spur Wind IIIForward forecasts, scenario decomposition, and risk-decision tooling for this asset.