22.5 MW Wood Waste operating in Dorchester, SC
22.5 MW
Nameplate Capacity
1
Generators
unit
Wood/Wood Waste Biomass
Technology
2013
Operating Since
Coordinates
33.2400, -80.4544
County
Dorchester, SC
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Dorchester Biomass LLC | Dorchester Biomass LLC | — |
| Owner(s) | Dorchester Biomass LLC | Dorchester Biomass LLC | — |
| Status | Operating | operating | — |
Dorchester Biomass is a 22.5 MW biomass power plant located in Dorchester County, South Carolina. The plant began operating in 2013 and is owned and operated by Dorchester Biomass LLC. The primary fuel source is wood and wood waste (WDS), and the plant utilizes one generator. Dorchester Biomass ranks fourth out of five biomass plants in South Carolina and 52nd out of 97 nationally.
The plant operates within the South Carolina Public Service Authority balancing authority and the SERC NERC region. In its most recent year of operation, Dorchester Biomass generated 130,371 MWh of electricity, achieving a capacity factor of 65.9%.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
South Carolina Public Service Authority (SC)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
13.8K MWh
Latest Month
130.4K MWh
Annual Generation
65.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
3 lb/MWh
SO₂
0.437 lb/MWh
CH₄
1 lb/MWh
N₂O
0.162 lb/MWh
Capacity Factor
77.3%
Annual Net Gen
152 GWh
CO₂eq
77 lb/MWh
Subregion
SERC Virginia/Carolina
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $78.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Dorchester BiomassForward forecasts, scenario decomposition, and risk-decision tooling for this asset.