Search plants, projects, owners, and states
4.6 MW Natural Gas operating in Windham, CT
4.6 MW
Nameplate Capacity
1
Generators
unit
Natural Gas Fired Combustion Turbine
Technology
2009
Operating Since
Coordinates
41.8628, -71.8917
County
Windham, CT
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Frito Lay Incorporated Dayville | — | — |
| Owner(s) | Frito Lay Incorporated Dayville | — | — |
| Status | Operating | — | — |
Frito Lay Incorporated is a 4.6 MW natural gas-fired power plant located in Windham County, Connecticut. The plant, which began operating in 2009, is owned and operated by Frito Lay Incorporated Dayville. It consists of a single natural gas-fired combustion turbine generator. The plant is connected to the ISO New England Inc. balancing authority and is within the NPCC NERC region.
In the most recent year of data, the plant generated 24,792 MWh of electricity, achieving a capacity factor of 61.5%. Frito Lay Incorporated ranks as the 29th largest power plant in Connecticut out of 49 facilities, and it holds the 1610th position nationally out of 1963 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
23.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
Industrial Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
2.1K MWh
Latest Month
24.8K MWh
Annual Generation
61.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1840 lb/MWh
NOx
5 lb/MWh
SO₂
0.050 lb/MWh
CH₄
0.035 lb/MWh
N₂O
0.003 lb/MWh
Capacity Factor
55.4%
Annual Net Gen
22 GWh
CO₂eq
1842 lb/MWh
Subregion
NPCC New England
2013
$965/kW
Est. Construction Cost
Total estimated cost: $4.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Lake Road Substation · 345 kV
Substation Distance
< 10 km
Operator
Eversource
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
—
Pricing Hub
.Z.CONNECTICUT
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Frito Lay IncorporatedForward forecasts, scenario decomposition, and risk-decision tooling for this asset.