80 MW Solar operating in Iron, UT
80 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2015
Operating Since
Coordinates
37.8828, -112.9042
County
Iron, UT
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | MN8 Energy LLC | Swinerton Renewable Energy | — |
| Owner(s) | MN8 Energy LLC | Scatec ASA | — |
| Status | Operating | operating | — |
GEM identifies the owner as Scatec ASA
This entity is not yet in the GEM ownership database — chain unavailable.
Red Hills Renewable Energy Park is a 104 MWp (80 MWAC) photovoltaic power plant located about 3 miles northwest of the town of Parowan in Iron County, Utah. It was the largest solar facility in the state when it came online in December, 2015. The power is being sold under a 20-year power purchase agreement to Rocky Mountain Power which serves customers in Utah, Idaho, and Wyoming.
Read more on WikipediaUtah Red Hills Renewable Energy Park is an 80 MW solar photovoltaic power plant located in Iron County, Utah. The plant, which began operating in 2015, is owned and operated by MN8 Energy LLC. It utilizes a single-axis tracking system to maximize solar energy capture. The plant is connected to the PacifiCorp - East balancing authority within the Western Electricity Coordinating Council (WECC) NERC region.
The facility consists of a single generator and ranks as the 14th largest solar plant in Utah out of 58, and 697th nationally out of 7108. In its most recent year of operation, the plant generated 208,560 MWh of electricity, achieving a capacity factor of 29.7%. Financial data is available for the plant from LBNL, suggesting transparency in its economic performance.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
PacifiCorp - East (PACE)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
10.0K MWh
Latest Month
208.6K MWh
Annual Generation
29.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Historic financial signal for this asset — PPA, LCOE, market value where reported. The base for forward bankability and insurance analytics on the InfraSure platform.
Data from 2015–2024
$16.1/MWh
Energy Value
$11.6/MWh
Capacity Value
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Utah Red Hills Renewable Energy ParkForward forecasts, scenario decomposition, and risk-decision tooling for this asset.