3.9 MW Natural Gas Steam Turbine (3 MW) + Petroleum Liquids (1 MW) standby in Sacramento, CA
3.9 MW
Nameplate Capacity
3
Generators
units
Hybrid (2)
Technology
Natural Gas Steam Turbine + Petroleum Liquids
2010
Operating Since
Coordinates
38.5739, -121.5014
County
Sacramento, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | State of CA DGS BPM | — | — |
| Owner(s) | State of CA DGS BPM | — | — |
| Status | Standby | — | — |
The DGS Central Utility Plant is a 3.9 MW hybrid power plant located in Sacramento County, California. The plant began operating in 2010 and is owned and operated by the State of CA DGS BPM. It utilizes both natural gas steam turbine and petroleum liquids technologies, with distillate fuel oil (DFO) as its primary fuel source. The plant consists of 3 generators.
The DGS Central Utility Plant operates within the Balancing Authority of Northern California (BANC) and is part of the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, the plant is ranked 14th out of 16 similar plants in California and 613th out of 886 nationally.
Generated from EIA, GEM, and public data sources
Grid Region
California (non-ISO)
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Balancing Authority of Northern California (BANC)
Grid Voltage
4.16 kV
Regulatory Status
NR — Non-Regulated
Entity Type
State
Sector
Commercial CHP
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2013
$765/kW
Est. Construction Cost
Total estimated cost: $3.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about DGS Central Utility Plant