Search plants, projects, owners, and states
74.8 MW Wind operating in Huron, MI
74.8 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2013
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
43.7578, -83.2978
Reference point reported to EIA.
County
Huron, MI
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
4 mapped line sections connect the two facilities over 26.947 km. The line reaches both facility footprints in the source data.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
Sources can describe different roles or reporting dates. The source-specific values below are retained for comparison.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Pheasant Run Wind LLC | NextEra Energy | — |
| Owner(s) | Pheasant Run Wind LLC | NextEra Energy | — |
| Status | Operating | operating | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Pheasant Run Wind LLC is a 74.8 MW wind power plant located in Huron County, Michigan. The plant began operating in 2013 and is owned and operated by Pheasant Run Wind LLC, a subsidiary of NextEra Energy. It consists of a single generator utilizing onshore wind turbine technology. The facility is interconnected to the Midcontinent Independent Transmission System Operator (MISO) grid and falls within the ReliabilityFirst Corporation (RFC) NERC region.
The plant's wind turbines have a hub height of 80 meters and a rotor diameter of 100 meters. The turbines were manufactured by GE Wind and are model GE1.7-100. In its most recent year of operation, Pheasant Run Wind generated 256,171 MWh of electricity, achieving a capacity factor of 39.1%. Pheasant Run Wind ranks as the 23rd largest wind farm in Michigan out of 35, and 844th nationally out of 1424.
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
30.8K MWh
Latest Month
256.2K MWh
Annual Generation
39.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $141.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Winsor Substation · 345 kV
Substation Distance
0 km
Operator
DTE Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
DECO.BROOKFLD1
Pricing Hub
MICHIGAN.HUB
Node Source
Curated node match
2 buyers • 81 active contracts
Last updated 2026-05-31
View all 5 articlesMichigan in Michigan growth signals — PPAs, construction, new projects
Summary analysis with parallel narrative sections and visualizations.
A specific company (e.g., NextEra Energy, Duke Energy)
Data-driven briefing on NextEra Energy — fleet, generation, financial, and news signals.
NextEra Energy
Data-driven briefing on NextEra Energy — fleet, generation, financial, and news signals.
NextEra entity test
Data-driven briefing on NextEra Energy — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.