Search plants, projects, owners, and states
266.8 MW Wind operating in Columbia, WA
266.8 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2014
Operating Since
Coordinates
46.4299, -118.0443
County
Columbia, WA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Portland General Electric Co | Portland General Electric | — |
| Owner(s) | Portland General Electric Co | Portland General Electric | — |
| Status | Operating | operating | — |
The Tucannon River Wind Farm is a 266.8 MW wind power facility located in Columbia County, Washington. The plant began operating in 2014 and is owned and operated by Portland General Electric (PGE). It utilizes a single generator comprised of onshore wind turbine technology. Specifically, the facility is equipped with Siemens SWT-2.3-108 wind turbines, featuring a rotor diameter of 108 meters and a hub height of 80 meters.
In the most recent year of data, the Tucannon River Wind Farm generated 808,346 MWh of electricity, achieving a capacity factor of 34.5%. The plant is interconnected to the grid within the Portland General Electric Company balancing authority, operating within the Western Electricity Coordinating Council (WECC) NERC region. The Tucannon River Wind Farm is the third-largest wind farm in Washington state out of 17, and ranks 144th nationally out of 734 wind facilities.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Portland General Electric Company (PGE)
Grid Voltage
230.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
54.3K MWh
Latest Month
808.3K MWh
Annual Generation
34.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2014
$1,935/kW
Est. Construction Cost
Total estimated cost: $516.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
LMP Node
TRW1_2_GNODE1
Pricing Hub
—
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Tucannon River Wind FarmForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo