18.7 MW Natural Gas Fired Combustion Turbine (5 MW) + Natural Gas Internal Combustion Engine (5 MW) + Petroleum Liquids (9 MW) standby in Bronx, NY
18.7 MW
Nameplate Capacity
15
Generators
units
Hybrid (3)
Technology
Natural Gas Fired Combustion Turbine + Natural Gas Internal Combustion Engine + Petroleum Liquids
1994
Operating Since
Coordinates
40.8814, -73.8803
County
Bronx, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Montefiore Medical Center Moses Division | — | — |
| Owner(s) | Montefiore Medical Center Moses Division | — | — |
| Status | Standby | — | — |
The Montefiore Medical Center Moses Division is a hybrid power plant located in Bronx County, New York. The plant has a total capacity of 18.7 MW across 15 generators. It commenced operations in 1994 and is owned and operated by Montefiore Medical Center Moses Division. The primary fuel source is distillate fuel oil (DFO), and the plant utilizes a mix of technologies including natural gas-fired combustion turbines, natural gas internal combustion engines, and petroleum liquids.
The plant operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In the most recent year of reported data, the plant generated 31,921 MWh of electricity, achieving a capacity factor of 19.4%. The Montefiore Medical Center Moses Division is ranked as the 10th largest plant out of 66 in New York State, and 206th out of 886 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
13.8 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Commercial
Sector
Commercial CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
3.0K MWh
Latest Month
31.9K MWh
Annual Generation
19.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1170 lb/MWh
NOx
4 lb/MWh
SO₂
0.090 lb/MWh
CH₄
0.026 lb/MWh
N₂O
0.003 lb/MWh
Capacity Factor
15.2%
Annual Net Gen
29 GWh
CO₂eq
1172 lb/MWh
Subregion
NPCC NYC/Westchester
2013
$765/kW
Est. Construction Cost
Total estimated cost: $14.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
E179THST_138_KV_TB4_REV_LBMP_J
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
N.Y.C.
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Montefieor Medical Center Moses DivisionForward forecasts, scenario decomposition, and risk-decision tooling for this asset.