4.4 MW Landfill Gas operating in San Joaquin, CA
4.4 MW
Nameplate Capacity
2
Generators
units
Landfill Gas
Technology
2014
Operating Since
Coordinates
38.0297, -120.9297
County
San Joaquin, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Ameresco San Joaquin, LLC | — | — |
| Owner(s) | Ameresco San Joaquin, LLC | — | — |
| Status | Operating | — | — |
Ameresco San Joaquin is a 4.4 MW landfill gas power plant located in San Joaquin County, California. The facility began operating in 2014 and is owned and operated by Ameresco San Joaquin, LLC. It consists of two generators utilizing landfill gas as its primary fuel source. The plant is interconnected to the California Independent System Operator (CAISO) grid, operating within the Western Electricity Coordinating Council (WECC) NERC region.
In the most recent year of reported data, Ameresco San Joaquin generated 30,703 MWh of electricity, achieving a capacity factor of 79.4%. The plant is ranked 17th out of 40 landfill gas facilities in California based on capacity, and 131st out of 284 such facilities nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
2.7K MWh
Latest Month
30.7K MWh
Annual Generation
79.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.324 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
80.2%
Annual Net Gen
31 GWh
CO₂eq
0.000 lb/MWh
Subregion
WECC California
2014
$1,987/kW
Est. Construction Cost
Total estimated cost: $8.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Bellota Substation · 230 kV
Substation Distance
0.002 km
Operator
Pacific Gas and Electric Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
CORRAL1_6_N002
Pricing Hub
TH_NP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Ameresco San JoaquinForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo